View all projects
Black Warrior
The Black Warrior Solid Waste Authority in Tuscaloosa County, Alabama, has awarded VBM a project to develop and operate a renewable natural gas (RNG) initiative called the Black Warrior Project. This project involves upgrading and expanding the existing Gas Collection and Control System (GCCS). In addition, VBM will construct an RNG processing plant and a natural gas pipeline with an interconnection.